Planning for general power outages

Industry sector: Industrials

In order to carry out work, the complete shutdown of the electricity supply to a mine on its entire production site is required annually. The interruption has serious consequences since it impacts all activities and there is a risk of a long restart. This is why the duration of the shutdown must be reduced to a minimum in order to limit losses.

Challenges

The main challenge is to restart on time or earlier. As long as the restart is not executed, the losses accumulate. The STI Maintenance team used its expertise to help optimize shutdown duration and prevent start-up delays.

Through its protocol, it has reduced the risks of having to rework the site after start-up, in particular by taking additional and preventive actions in that sense.

The results

Following rigorous and quality planning, the results are there. No accident or incident during the shutdown period, all of the work was carried out in an optimized time, i.e. 20% less than originally planned. A performance that pays off down the line for our client.